Metal pergola trellis for climbing plants
This metal pergola trellis gives climbing plants a strong frame, so the structure turns into a living shade over time. The support tubes are 40 x 40 mm and 2400 mm or longer, with material choices of Q235, Q345 steel or 6063-T6 aluminum.
It works for wisteria, climbing roses, grapes and other vines in gardens, restaurants, parks and school grounds.

Key features
- 40 x 40 mm support tubes, 2400 mm and longer
- Q235, Q345 or 6063-T6 material options
- Powder coating or PVDF finish
- Sold per set, made to your pergola layout
Specifications
- Support tube: 40 x 40 mm, 2400 mm or longer
- Weight: 80 kg per set
- Material: Q235 / Q345 steel or 6063-T6 aluminum
- Finish: powder coating or PVDF
- Minimum order: 1 set
- Lead time: 25-40 days
Materials and finishes
- Q235 carbon steel: a widely used low-carbon structural steel that welds and forms easily. It needs a protective coating or galvanizing outdoors.
- Q345 steel: a low-alloy structural steel that is stronger than Q235, used where the frame carries more load or spans further.
- 6063-T6 aluminum: an extrusion alloy common in architectural profiles. It is light, does not rust and takes anodizing or coatings well.
- Powder coating: dry powder applied electrostatically and cured into a hard, even layer. It comes in many colours and resists chipping and fading.
- PVDF coating: a fluoropolymer finish known for UV and weather resistance, used on architectural metalwork.
Where it is used
- Garden pergolas with climbing plants
- Restaurant and cafe terraces
- Parks and public gardens
- School and campus green spaces
How customization works
- Send your drawing, sample photo or size list.
- We confirm the design, material and finish with you.
- Production starts, with quality inspection before shipment.
Frequently asked questions
Which plants can it support?
Climbing plants such as wisteria, roses and grapes. The tube spacing can be adjusted to your plants.
What is the minimum order?
The minimum order is 1 set.
What is the lead time?
The lead time is 25-40 days.